Songa Energy develops, builds, owns and operates two grid-connected hydropower plants in south-central Burundi on the Upper Ruvyironza River (1.65 MW) and the Upper Mulembwe River (9.0 MW). Construction began on the hydropower plants in 2023, with the first power to be delivered onto the Burundi national grid by the end of 2024.

This past week our team visited the second site that we are developing in Burundi Read more
Our first hydroelectric site (1000-1500KW) is on the Ruvyironza River, which is the southern-most tributary Read more
There is no question that there are challenges to doing business in Burundi - and Read more
A big part of developing a hydroelectric site is understanding the topography of the site Read more

Contact Us

E-mail: info@virungapower.com
Address: Old East Building
Place de l’Indépendance
Bujumbura, Burundi