Songa Energy develops, builds, owns and operates two grid-connected hydropower plants in south-central Burundi on the Upper Ruvyironza River (1.65 MW) and the Upper Mulembwe River (9.0 MW). Both hydropower plants will begin construction in 2023, with the first power to be delivered onto the Burundi national grid by the end of 2024.

A big part of developing a hydroelectric site is understanding the topography of the site Read more
This week our team installed a "gaging station" on the Ruvyironza River, just downstream of Read more
The Songa Energy team visited the Kayongozi hydropower site in Ruyigi Province of Burundi. This Read more
As violence escalates in the region, the people of Burundi continue to hope for peace. Read more

Contact Us

E-mail: info@virungapower.com
Address: Old East Building
Place de l’Indépendance
Bujumbura, Burundi