Songa Energy develops, builds, owns and operates two grid-connected hydropower plants in south-central Burundi on the Upper Ruvyironza River (1.65 MW) and the Upper Mulembwe River (9.0 MW). Both hydropower plants will begin construction in 2023, with the first power to be delivered onto the Burundi national grid by the end of 2024.

Songa Energy has partnered with Virunga Power as an investor and co-developer of our projects Read more
Engagement with the local community and administration is very important in our small hydropower projects. Read more
Burundi is barely known around the world, and what people do know about Burundi is Read more
Songa Energy's vision for Burundi is that it has a growing and vibrant economy, which Read more

Contact Us

E-mail: info@virungapower.com
Address: Old East Building
Place de l’Indépendance
Bujumbura, Burundi